How to compare renovation quotes

ImmoZen

Getting several quotes for a renovation project is good practice. The challenge is comparing them on equal footing. A lower quote is not necessarily a better deal if it excludes items the others include. This guide helps you ask the right questions before making a choice.

Scope of work: the starting point

Before comparing prices, confirm that each quote covers exactly the same work. One quote may include demolition, protection of adjacent areas, debris removal and finishing; another may exclude them. Ask each contractor to specify what is included and what is not.

Also check material quantities and specifications. 'Bathroom tile' can refer to very different products across quotes. If materials have not yet been selected, ask whether the quote is based on an allowance (a budgeted amount) or a specific product. An allowance set too low can lead to extras.

What each quote should specify

For a fair comparison, each quote should state: detailed scope of work, room by room; materials selected or allowances provided; what is included (demolition, protection, removal, finishing); what is excluded (appliances, permits, specialty trades); assumptions about schedule, site access and deliveries.

Contingency reserve and taxes

Every renovation involves some unknowns. Check whether the quote includes a contingency reserve or whether it is in addition to the quoted amount. Also confirm whether the amounts shown are before or after tax — a tailored proposal will clarify the scope and the conditions that apply to your project.

Changes during the project

Ask how changes are documented and billed. A sound process requires written approval before any additional work is carried out. This protects both parties and avoids surprises at the end of the project.

Questions to resolve before choosing

Before accepting a quote, make sure you have clear answers to these questions: Does each quote cover exactly the same scope? Are materials specified or based on allowances? Are demolition, protection and removal included? Are appliances and specialty trades included or excluded? Does the schedule account for your access constraints? How are changes documented and approved?

Checklist

  • Scope of work — identical across all quotes?
  • Materials — specific products or allowances?
  • Demolition and removal — included or excluded?
  • Finishing — paint, caulking, cleaning included?
  • Appliances — supplied by contractor or by you?
  • Permits — who is responsible?
  • Contingency reserve — included or to be added?
  • Taxes — amounts before or after tax?
  • Changes — written approval process?

What you can send to ImmoZen

To prepare for a first conversation, gather a few photos of the room or spaces involved, approximate dimensions, your list of priorities, your municipality and your preferred timeline. Our budget estimator gives you a planning range before the first meeting. A tailored proposal will specify the exact scope of work and the conditions that apply to your project.

Ready to plan your project?

Get an indicative range with our estimator, then prepare for a first conversation.

A new life for your home.

We serve homeowners throughout the Eastern Townships. Availability by location is assessed on a case-by-case basis.

Contact

Stay informed

Renovation tips in your inbox

Practical advice, trends, and ImmoZen project case studies. No spam — unsubscribe anytime.

© 2026 ImmoZen Inc. | All Rights Reserved.